PPS

Jaggery Plant

Performance and Product Services (PPS)

We’re proud to share one of our recent turnkey accomplishments—a one-time engineered, fully automated jaggery production plant delivered to Performance and Product Services (PPS), a leading player in manufacturing and packaging solutions.

THE VISION

PPS sought to diversify into the jaggery market with a state-of-the-art facility capable of end-to-end automation. After in-depth consultations to understand their throughput targets and quality requirements, NS3 Projects proposed a one-time engineering solution—an expertly designed and engineered system tailored to meet the entire jaggery production process, from raw sugarcane to the final product.

One-Time Engineering Excellence

One of the standout features of this project was the one-time engineering approach we applied. We meticulously designed a fully integrated, automated system that requires no ongoing modifications or customizations, delivering an out-of-the-box solution that:

Ensures Efficiency

From raw material handling to the final packaging, every step is automated, reducing the need for manual intervention and increasing operational efficiency.

Maximizes Scalability

Engineered for future growth, the plant layout and systems can adapt to higher capacities without redesign.

Saves Time & Costs

A standardized, well-documented system ensures quicker installation, lower engineering costs, and a faster ramp-up to full production.

Our Scope of Work

We supported PPS every step of the way, from concept to commissioning, providing a comprehensive one-time engineering solution. Our contributions included:

» Engineering Layout Planning

» Detailed Engineering Drawings

» Fabrication and Design Execution

» On-Site Installation and Supervision

Plant Features

The plant was initially targeted for a 100-ton capacity and was developed as a fully automated system, ensuring minimal manual intervention and high operational efficiency. A key highlight is the automated powder jaggery system, seamlessly integrated into the process flow.

On-Time Delivery

From project initiation to final handover, the entire setup—including erection, commissioning, and capacity trials—was successfully completed in just 6 months. After a successful capacity run and performance validation, we proudly handed over the plant to the PPS team, who now benefit from a one-time engineered system designed to perform for years to come.

Project Gallery

location

Namakkal, Tamil Nadu

Type

One-Time Engineered Fully Automated

Capacity

100 TCD